5-star hotel spa refurbishment

5-star hotel spa refurbishment

This 5-star hotel in central London had an on-going issue with their steam room in their spa so approached MJC to engineer a solution. We completely removed the existing arrangement and designed from the ground up a bespoke stainless steel and glass solution, safe to say, no steam escapes now! They also wanted a separate treatment room within the spa area and asked us to design a solution. As space was tight we were constrained to a sliding door arrangement, top hung from the slab it features a stainless steel construction and fluted glass to match other glass in the spa area. It works beautifully and seamlessly integrated within the existing spa design.

Click on an image below to open a scrolling gallery.

5-star hotel spa refurbishment

This 5-star hotel in central London had an on-going issue with their steam room in their spa so approached MJC to engineer a solution. We completely removed the existing arrangement and designed from the ground up a bespoke stainless steel and glass solution, safe to say, no steam escapes now! They also wanted a separate treatment room within the spa area and asked us to design a solution. As space was tight we were constrained to a sliding door arrangement, top hung from the slab it features a stainless steel construction and fluted glass to match other glass in the spa area. It works beautifully and seamlessly integrated within the existing spa design.

Click on an image below to open a scrolling gallery.